Cart
Free Shipping in Australia
Proud to be B-Corp

Understanding Tendering and Estimating A.A Kwakye

Understanding Tendering and Estimating By A.A Kwakye

Understanding Tendering and Estimating by A.A Kwakye


$17.49
Condition - Good
Only 1 left

Summary

This text looks at tendering and estimating within the construction industry. The author focuses on four main themes: the client's development strategy, the efficient use of the contractors resources, the tendering and estimating process, and tender analysis and direction.

Understanding Tendering and Estimating Summary

Understanding Tendering and Estimating by A.A Kwakye

Unfortunately we do not have a summary for this item at the moment

Table of Contents

Part 1 Construction procurement: construction generally; types of construction activities; demand for construction product; construction industry; characteristics of the construction industry; classification of client's; participants in the construction process; price determination.Part 2 Clients development strategy: client's economic considerations; traits of suitable contractor; contractural arrangement. Part 3 Selection of contractor: selection of decision; timing the selection; mode of contractor selection. Part 4 Contractor's business/organization: contractor's business needs; resource management; sub-contracting. Part 5 Tender action: tender enquiry; preliminary enquiry; decision to tender; tender documents; sequence of tender preparation; elemental analysis of cost; winter working; compiling the estimate. Part 6 Estimating: generally; demolition and alterations - SMM7 Section C; groundworks - SMM7 Section D; concrete work - SMM7 Section E; masonry - SMM7 Section F; carpentry/timber/first fixing - SMM7 Section G20; clay/concrete and lead roof covering - SMM7 Sections H60, H71; built-up felt roofing - SMM7 Section J41; plasterboard dry lining - SMM7 Sections K10, K31; timber flooring/sheathing/lining etc - SMM7 Sections K11, K20 and K21; windows/doors/stairs - SMM7 Sections L10, L20 and L30; general glazing - SMM7 Section L40; sand cement/concrete etc/flooring - SMM7 Section M10; plastered/rendered/roughcast coating - SMM7 Section M20; stone/concrete/quarry/ceramic tiling/mosaic - SMM7 Section M40; decorative paper/fabric - SMM7 Section M52; painting/clear finishing - SMM7 Section M60; disposal and piped supply systems - SMM7 Sections R10, S10; drainage below ground - SMM7 Section R12. Part 7 Completing the tender: generally; preliminaries; preparation of report for management; the tender; adjustment of net estimate; firm price tender risk calculations; effect of value added tax (VAT) on tenders. Part 8 Tender analysis: tender check; correction of errors; variations in tenders; direction of traditional tendering; tendering arrangement outside the United Kingdom.

Additional information

GOR004849480
9780566075094
0566075091
Understanding Tendering and Estimating by A.A Kwakye
Used - Good
Paperback
Taylor & Francis Ltd
19941013
320
N/A
Book picture is for illustrative purposes only, actual binding, cover or edition may vary.
This is a used book - there is no escaping the fact it has been read by someone else and it will show signs of wear and previous use. Overall we expect it to be in good condition, but if you are not entirely satisfied please get in touch with us

Customer Reviews - Understanding Tendering and Estimating