Panier
Livraison gratuite
Nous sommes Neutres au Carbone

Nec3 Engineering and Construction Contract Flow Charts NEC

Nec3 Engineering and Construction Contract Flow Charts par NEC

Nec3 Engineering and Construction Contract Flow Charts NEC


39,00 €
État - Très bon état
Disponible en seulement 2 exemplaire(s)

Résumé

Enables users to understand the operation of the Engineering and Construction Contract. This book contains flow charts which set out the procedural logic of the 75 clauses that can be presented with benefit by flow charting.

Nec3 Engineering and Construction Contract Flow Charts Résumé

Nec3 Engineering and Construction Contract Flow Charts NEC

To enable users to understand the operation of the Engineering and Construction Contract, this book contains flow charts which set out the procedural logic of the 75 clauses that can be presented with benefit by flow charting.

Sommaire

Flow charts * 13 Communications * 14 The Project Manager and the Supervisor * 15 Adding to the Working Areas * 16 Early warning * 17 Ambiguities and inconsistencies * 18 Illegal and impossible requirements * 19 Prevention * 20 Providing the Works * 21 The Contractor's design * 22 Using the Contractor's design * 23 Design of Equipment * 24 People * 25 Working with the Employer and Others * 26 Subcontracting * 27 Other (Contractor) responsibilities * 30 Starting, Completion and Key Dates * 31 The programme * 32 Revising the programme * 33 Access to and use of the Site * 34 Instruction to stop or not to start work * 35 Take over * 36 Acceleration * 40 Tests and inspections * 41 Testing and inspection before delivery * 42 Searching for and notifying Defects * 43 Correcting Defects * 44 Accepting Defects * 45 Uncorrected Defects * 50 Assessing the amount due S * 51 Payment * 52 Defined Cost * 53 The Contractor's share (Option C and D) * 54 The Activity Schedule (Option A and C) * 55 The Bill of Quantities (Option B and D) * 60 Compensation events * 61 Notifying compensation events * 62 Quotations for compensation events * 63 Assessing compensation events * 64 The Project Manager's assessments * 65 Implementing compensation events * 70 The Employer's title to Plant and Materials * 71 Marking Equipment, Plant and Materials outside the Working Areas * 72 Removing Equipment * 73 Objects and materials within the Site * 80 Employer's risks * 81 Contractor's risk * 82 Repairs * 83 Indemnity * 84 Insurance cover * 85 Insurance policies * 86 If the Contractor does not insure * 87 Insurance by the Employer * 90 Termination * 91 Reasons for termination * 92 Procedures on termination * 93 Payment on termination * W1 Dispute resolution (used unless Option Y(UK)2 applies) * W2 Dispute resolution (used when Option Y(UK)2 applies) * X1 Price adjustment for inflation (used only with Options A, B, C and D) * X2 Changes in the law * X3 Multiple currencies (used only with Options A and B) * X4 Parent company guarantee * X5 Sectional Completion * X6 Bonus for early Completion * X7 Delay damages * X12 Partnering * X13 Performance bond * X14 Advanced payment to the Contractor * X15 Limitation of the Contractor's liability for his design to reasonable skill and care * X16 Retention (not used with Option F) X17 Low performance damages * X18 Limitation of liability * X20 Key Performance Indicators (not used with Option X12) * Y(UK)2 The Housing Grants, Construction and Regeneration Act 1996 * Y(UK)3 The Contracts (Rights of Third Parties) Act 1999

Informations supplémentaires

GOR006480311
9780727733672
0727733672
Nec3 Engineering and Construction Contract Flow Charts NEC
Occasion - Très bon état
Broché
ICE Publishing
20050101
120
N/A
La photo du livre est présentée à titre d'illustration uniquement. La reliure, la couverture ou l'édition réelle peuvent varier.
Il s'agit d'un livre d'occasion - par conséquent, il a été lu par quelqu'un d'autre et il présente des signes d'usure et d'utilisation antérieure. Dans l'ensemble, nous nous attendons à ce qu'il soit en très bon état, mais si vous n'êtes pas entièrement satisfait, veuillez prendre contact avec nous.